Power: 15kw.
Voltage: 400V.
Purpose: high frequency braking resistor.
The braking ability provided by the braking capacity is larger than that provided by the external braking resistor.
Can also be connected without built-in brake transistor inverter.
Three types of discharge resistors are available.
Please select according to the required braking torque. Drive unit 200VAC/400VAC level.
MITSUBISHI motor general AC servo amplifier MELSERVO-J3 series
HG-RR153B
Need conversion unit MR-J3-CR55K) supporting the use of.
Rated output: 30kw.
Interface type: SSCNET type III fiber communication.
Power specification: three phase AC200V.
High speed serial communication between the SSCNET and the servo amplifier by using the fastest up to 0.44ms communication cycle,
A fully synchronous control system can be constructed.
It is only necessary to insert the special optical fiber into the joint to form SSCNET III network, which greatly reduces the wiring work and reduces the possibility of false wiring.
Due to the adoption of the optical fiber communication, the anti noise ability can be greatly improved and the long distance wiring of 50 meters (maximum 800 meters x 16 axes) can be realized.
A servo amplifier to meet the full closed loop control function MR-J3-B-RJ006.
Suitable for mechanical servo optimization and adjustment!
More advanced optimization adjustment function and control function to maximize mechanical properties. Input points: 16 points.
Voltage: DC12/24V.
Current: 4/10mA.
Response time: 10ms.
8 points / a common end.
Cathode common.
20 point terminal station.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
HG-RR153B Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=HG-RR153B&select=5