8 slots.
The main substrate needs to be equipped with CPU and power supply.
Requires 1 power modules.
Used to install large Q series modules.
Optimal network matching for application purposes and applications,
Seamless communication between different hierarchical systems.
Enhancing the ability of information communication through network.
This is also a major task in the field of automation.
Network environment provided by Q series
Is truly open & seamless
IS74-3.7K-CHT
Including based on universal ethernet,
Achieve easy management of the environment "IE Control CC-Link" controller network,
As well as in its management to achieve a high-speed, high-capacity transmission of the "IE Field CC-Link" field network.
Also including Japan''s first, to achieve the world standard,
And get the SEMI certification of the field network "CC-Link",
And inherited the design concept of the provincial distribution network CC-Link/LT".
And support sensor networks "AnyWire",
To enrich the lineup flexibility to integrate the various layers of automation network.
A variety of modules with excellent performance,
Meet the needs of various control from analog to location.
Q series module products include a variety of types of I/O, analog and positioning function module.
Can fully meet the switch, sensor, such as the input and output, temperature, weight, flow and motor, drive control,
As well as the requirements of high-precision control of the positioning of the industry, the control needs of various fields.
Can also be used in combination with the CPU module to achieve appropriate control.Screw, 2 piece type terminal
Thermocouple Input module.
Number of channels: 4 channels.
Number of stations: 1 stops.
Station type: remote equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
IS74-3.7K-CHT Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=IS74-3.7K-CHT&select=5