Series introduction: set a number of basic functions in a small body model.
Screen size: 4.7 inches.
Display color: monochrome.
Mounting type: panel mounting type.
Resolution: QVGA (320 x 240)
Display device: STN monochrome (blue / white).
Host frame color: black.
Power type: DC24V.
Communication interface: with built-in RS-422.
Set a number of basic functions in a compact type.
GT1055/GT1050/GT1045/GT1040:
User storage capacity: 3MB
MR-J3-700T4
Device USB port.
The standard RS-422/485 and RS-232 interface.
GT1030/GT1020:
User storage capacity: 1.5MB (gt1030) /512kb (gt1020).
Three color LED backlight design, equipment status at a glance.
The standard RS-422/485 or RS-232 interface.
Touch screen, also known as touch screen, touch panel, is a kind of induction type liquid crystal display device can receive contacts and other input signals,
When touching the screen button on the screen,
The tactile feedback system on the screen can drive various connecting devices according to the pre programmed program,
Can be used to replace the mechanical button panel, and by the liquid crystal display screen to create the image of the effect of birth. DC input points: 16 points.
Input voltage and current: 5mA, DC24V.
Response time: 10ms.
16 point /1 a public side.
Positive / negative sharing.
Output points: 16 points.
Output voltage and current: DC24V, 0.1A/1 point, 1.6A/1 common end.
Response time: 2ms.
16 point /1 a public side.
Output form: transistor output, leakage type.
40 pin connector.
Number of stations: 4 stops.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
MR-J3-700T4 Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=MR-J3-700T4&select=5