Servo motor series: medium inertia, small capacity.
Rated output: 0.5kw.
Rated speed: 2000r/min.
Electromagnetic brake: incidental.
Oil seal: incidental (Note 1, note 2, note 3).
Power supply: 200V.
Note 1 through HG-KR and HG-MR series 0.1kW and HG-SR series can be supported.
Note 2 with the speed reducer case, do not configure the oil seal.
Note 3 with oil seal HG-KR, HG-MR series servo motor''s appearance size standard is different
MR-J4-20B1
Stable driving of medium capacity and medium inertia type products.
Through the optimization of structural design, to achieve the minimum length of the industry.
High speed & high torque. Shorten the positioning time, achieve high-speed equipment.
Reducing the electric torque ripple.
Through the combination of the optimal number of the motor and the slot number, the torque ripple is greatly reduced,
To further realize the smooth constant speed device.
Improve the environmental performance of HG-SR, HG-JR series of products using IP67. Input: 8 channels.
30kpps/10kpps/1kpps/100pps/50pps/10pps/1pps/0.1pps.
Counter input signal: DC5/12-24V.
The module is suitable for the measurement of the number of input pulses, such as speed, speed, instantaneous flow rate and so on,
As well as the quantity, the length, the cumulative flow and so on the measurement.
Input pulse values are updated every 10ms.
The number of pulses (sampling pulse number), which can be accumulated and processed by the moving average, is updated according to the counting period. Transmission line unit for MELSECNET/MINI (-S3) twisted pair data link.
Loop: twisted pair I/F.
Remote station: twisted pair line I/F.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
MR-J4-20B1 Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=MR-J4-20B1&select=5