Input type: DC input, positive public end / negative public end.
Input points: 32 points.
Enter the response time: 0.2ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 1 wire.
Fast connector type.
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program
NZ2GFCM1-16T
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Temperature measurement resistor input.
Number of input channels: 4ch.
Standard control.
Heating and cooling control.
Self tuning function.
Peak current suppression.
Heating function at the same time.
Sampling period switching function.
Temperature input mode.
Temperature regulation mode.
Achieve average temperature control
Warming function at the same time
By making the arrival time of the multi loop consistent, uniform temperature control function.
It can control temperature uniform, to ensure that the control object no local burning or thermal expansion.
No idle running, with energy saving effect, can reduce operating costs.
Can make multi loop to reach the target value (SV) of the same time.
By setting the simultaneous heating of the channel group, up to 2 groups of units, respectively, at the same time warming.
It is very effective to use the control object that does not want to heat up to the time of arrival error.
Applicable to a variety of systems.
Sampling period switching function.
Sampling period can be selected from 250ms/4ch and 500ms/4ch.
Equipped with temperature input mode.
The temperature control module can be used as a temperature input module.
By setting the switch, you can easily change the input mode. RS-422 1 channel.
Transfer speed: 38.4kbps.
Link points, 512 points.
The connection number: 8, 500m.
How to determine the input / output device of MITSUBISHI plc.
According to the control requirements of the system,
All input devices and output devices required for the determination of the system,
To determine the input / output device related to the MITSUBISHI PLC,
To determine the I/O PLC points.
Detailed analysis of the process and work characteristics of the controlled object,
To understand the coordination between the controlled object machine, electricity and liquid,
The control requirements of the controlled object for MITSUBISHI PLC control system are put forward,
Determine the control program, to develop a design task book.
NZ2GFCM1-16T Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=NZ2GFCM1-16T&select=5