Drive: MR-H_ACN series SSC-NET compatible AC servo.
Rated output: 22KW.
The servo controller can easily transfer the operation module and the field bus module through the automation interface,
At the same time using different fieldbus modules to achieve different control modes (RS485, RS232, optical fiber, InterBus, ProfiBus),
And the control mode of general inverter is single.
The servo controller is directly connected with a rotary transformer or an encoder, which forms a closed loop of speed and displacement control
A1SJ71AP21GE
The general inverter can only form an open loop control system.
Servo controller of the control parameters (such as steady-state accuracy and dynamic performance) is better than the general inverter. 12.1 inches.
Applicable models: GT27, GT25. A pack of 5.
Applicable models:
AJ65VBTS - - - type.
AJ65VBTCE - - - type.
AJ65VBTCU - - - type.
AJ65ABTP - - - type.
AJ65VBCU- - type.
AJ65SBT-CLB type. Ethernet network module 10BASE-T/10BASE5.
Control layer /MELSECNET/10 (H) is the middle layer of the whole network system,
Control network which is convenient and high speed processing data transmission between PLC, CNC and other control equipment.
As MELSEC control network MELSECNET/10,
With its good real-time performance, simple network settings, no procedures of the network data sharing concept,
As well as the redundant circuit and so on, has obtained the very high market appraisal,
The number of devices to reach the highest in japan,
In the world is also one of the few.
And MELSECNET/H not only inherited the excellent characteristics of MELSECNET/10,
Also makes the network real-time better, more data capacity,
Further adapt to the needs of the market. DC input points: 4 points.
Input voltage and current: 7mA, DC24V.
Input response time: 10ms.
4 point /1 a public side.
Positive pole sharing.
Output points: 4 points.
Output voltage and current: DC24V.
Output response time: 2ms.
4 point /1 a public side.
Output form: transistor output, leakage type.
24 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
A1SJ71AP21GE Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=A1SJ71AP21GE&select=5