MITSUBISHI motor universal AC servo amplifier MELSERVO-J3 series.
Rated output: 0.1kw.
Interface type: SSCNET type III fiber communication.
Special features: integrated driver security.
Power specification: single phase AC100V.
STO function as a security feature is added to the SSCNET III fiber communication type servo amplifier.
By using the STO function, the electromagnetic contactor used in the past to prevent the motor from accidentally starting is no longer needed
FR-A540-11K-CH
SS1 functions can be realized by using the MR-J3-D05 security logic unit.
MR-J3-BS uses a full closed loop control system.
Compatibility with MR-J3-B.
MR-J3-BS installation, wiring and connectors are the same as the MR-J3-B, so do not change the existing connection will be easy to MR-J3-B
Change to MR-J3-BS.
Security functions are connected to the CN8 interface through an external security circuit to increase the MR-J3-BS driver security.
Compatible full closed loop control system.
MR-J3-BS has a full closed loop control system version. DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Input response time: 10ms.
8 point /1 a public side.
Positive / negative sharing.
Output points: 8 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 8A/1 common end.
Output response time: 12ms.
8 point /1 a public side.
Output form: relay.
40 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
FR-A540-11K-CH Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=FR-A540-11K-CH&select=5