Horizontally placed cable.
Length: 300mm.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation
FR-A720-0.4K Drive unit.
MITSUBISHI universal AC servo amplifier MELSERVO-J4 series.
Rated output: 37kw.
Interface: SSCNET III /H.
Power supply: three phase AC400V.
Support position control, speed control, torque control.
Position control to follow the position instructions.
When the control is inserted, the position control is performed.
Speed control follows the speed command to control the speed within a certain range.
Torque control to follow the torque command to control the stable torque.
Function of switching amplitude. The increase in the process of switching and stopping,
And in the operation of the use of the switching signal, switching growth. MITSUBISHI inverter FR-F740 series.
Voltage level: three phase 400V.
Frequency converter capacity: 250KW.
The main circuit of the inverter can be divided into two categories in general: voltage type is the voltage source of the DC converter for AC inverter,
The filtering of the DC circuit is the capacitance; the current mode is the DC conversion of the current source to the AC inverter,
The DC loop filter is the inductor.
Why is the frequency of the inverter voltage proportional to the change?
The electromagnetic torque of any motor is the result of the interaction between the current and the magnetic flux, the current is not allowed to exceed the rated value, otherwise it will cause the heating of the motor.
Therefore, if the magnetic flux decreases, the electromagnetic torque will decrease, which leads to the reduction of the load carrying capacity. "2 axes, SSCNET III type.
2 axis linear interpolation.
2 axis arc interpolation.
Control unit: mm, inch, degree, pulse.
Location data: 600 data / axis.
40 pin connector.
Through the SSCNET III cable connection to save wiring, the distance between the station up to 50m.
Absolute position system for determining the origin position is supported by the return data set operation.
In addition, the limit switch of the upper limit, the lower limit switch and the near point block signal input can be directly connected to the servo amplifier,
Thus greatly reducing the wiring requirements.
Easy to achieve high speed, high precision positioning control.
Support for multiple types of positioning control,
Including 2 ~ 4 axis 2 axis linear interpolation, circular interpolation, speed control and speed / position control, path switching control, constant speed control etc..
In addition, can use the "Configurator-QP GX" and other software,
Easy to set, monitor and debug. "
FR-A720-0.4K Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=FR-A720-0.4K&select=5