Twisted pair / rubber insulated cable.
Single bus.
LINK MELSEC-I/O (control unit).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system
FR-A740-55K-CHT
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc.. For MR-J2S-700A (4) /CP/CL or less.
Encoder adapter for HC-SFS; HC-LFS; HC-RFS; 2000r/min HA-LFS; HC-UFS servo motor. Servo motor series: ultra low inertia, small capacity.
Rated output: 0.4kw.
Rated speed: 3000r/min.
Electromagnetic brake: No.
Power supply: 200V.
The rated speed is 3000r/min, the maximum speed is 6000r/min.
The maximum torque of 350% of the rated torque, high torque in the field of high rotation, only to support the HG-KR series products.
Built in absolute position encoder with high resolution.
Standard high resolution absolute position encoder (4194304p/rev (22bit)).
To achieve a higher accuracy of the positioning function.
Improve the environmental performance of HG-KR, HG-MR, HG-RR, HG-UR series of products using IP65. 3C-2V/5C-2V coaxial cable.
Double circuit.
MELSECNET (II) (remote I/O station).
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
FR-A740-55K-CHT Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=FR-A740-55K-CHT&select=5