Total points: 32 points.
Input points: 16 points.
Input mode: DC24V (drain type).
Output points: 16 points.
Output form: Transistor (drain type).
Connection status: connector.
In order to extend the input output of the device.
Also has a built-in power supply products.
The maximum number of points for the input and output is 256.
Expansion module: up to 16 units (in addition to the power expansion module)
The total number of CC-Link, AnyWireASLINK, and Bitty series of remote I/O is 512 points
HF-SP81K Motor: HA-LH type.
Power: 2.0kw.
Speed: 2000r/min.
According to the types of power supply: can be divided into DC motor and AC motor.
The structure and working principle of DC motor can be divided into four parts: brushless DC motor and brushless DC motor.
Brushless DC motor can be divided into: permanent magnet DC motor and DC motor.
DC Motor Division: Series DC motor, DC motor, DC motor and DC motor.
Permanent magnet DC Motor Division: rare earth permanent magnet DC motor, ferrite permanent magnet DC motor and aluminum nickel Gu Yongci DC motor. Screw terminal table type.
High precision / high resolution / high speed 2 piece type terminal.
Voltage / current input module.
Number of channels: 4 channels.
Number of stations: 1 stops.
Station type: remote equipment station.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
HF-SP81K Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=HF-SP81K&select=5