Error output.
Rated open and close voltage, current: DC24V, 0.5A.
Minimum open and close load: DC5V, 1mA.
Response time (OFF, ON): 10ms below.
Response time (ON, OFF): 12ms below.
Life (Mechanical): more than 20 million times.
Life (Electrical) rated open and close voltage, current more than 100 thousand times.
Suitable for wire specifications: 0.3 ~ 2 square mm (AWG22 ~ 14) (twisted pair / single line)
MR-HSCBL20M
External wiring connection mode: spring clip terminal.
DC5V internal consumption current: 0.06A.
Weight: 0.11kg. Input and output points: 40 points.
Power supply: DC24V.
Input points: 24 points.
Output points: 16 points.
Output form: relay output.
Power consumption: 25W.
Weight: 0.7KG.
Outline dimension: 130x90x86mm.
FX3GE on the performance of the FX3GA increased analog input / output and Ethernet communication and other built-in features.
Applicable to a wide variety of applications.
Basic unit: 24/40 point.
Third generation standard model.
High flexibility.
Suitable for small scale control of high cost PLC.
Control points to 128 points, the use of CC-Link remote I/O can control the maximum 256 points.
A versatile PLC.
Built in CPU, power supply, input and output, analog input and output, Ethernet port, can be used immediately after the purchase.
High speed operation.
Basic instructions: 0.21 s/ instruction.
Application instruction: 0.5 s/ instruction.
Large capacity memory.
Built in program memory 32000 steps.
EEPROM memory cartridge with program transfer function. 2GB flash ROM.
Applicable models: GT16, GT15, GT11, HandyGOT5 slots.
To install the power supply.
For QnA/A series.
Switch volume control is designed to,
According to the current input combination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order.
So, sometimes also known as the order control.
And sequential control is divided into manual, semi-automatic or automatic.
And the control principle is decentralized, centralized and hybrid control three.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
MR-HSCBL20M Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=MR-HSCBL20M&select=5