Application: input power line for extended input module.
Length: 1.0m.
Auxiliary parts for FX3GC and FX3UC. Type: 18 point terminal.
Input / output form: analog voltage and current input.
Number of stations: 1 stops.
Number of channels: 4 channels.
The conversion speed of the analog input module can be selected from 100 mu s/ channel, 400 mu s/ channel and 1 mu s/ channel.
The conversion speed of the analog output module is 100 mu s/ channel
MR-J3-70B
By combining the analog input module and the expansion module, the switching time can be controlled more precisely. (trigger conversion function)
IE CC-Link field network remote equipment station. According to the equipment, more easily distributed input and output devices.
Can be connected to the expansion module, more convenient to expand the input and output points.
Support synchronous communication (using with simple motion control module).
According to the simple motion control module of the network (Master) control cycle of the implementation of the control cycle and its synchronization,
Implementation of multiple simultaneous action from the station. Output points: 8 points.
Output voltage and current: 0.3A/1, DC12/24V point.
Response time: 2ms.
All points of independence.
Output form: transistor output, leakage type.
26 point terminal station.
Number of stations: 1 stops.
Equipment layer / field bus CC-Link device layer is the PLC and other control devices and sensors and drive devices connected to the field network,
Network for the lowest layer of the whole network system.
Using CC-Link field bus connection, the number of wiring is greatly reduced,
Improve the maintainability of the system.
And, not just the amount of data ON/OFF and other switches,
Can also be connected to the ID system, bar code reader, inverter, man-machine interface and other intelligent devices,
From the completion of a variety of data communication, the management of the terminal production information can be realized,
On the centralized management of the state of the machine movement,
Make maintenance work efficiency also greatly improved.
Q series PLC in the use of CC-Link function better,
And easier to use.
Mitsubishi Co PLC network inherited the traditional use of the MELSEC network,
And make it better in terms of performance, function, easy to use etc..
Provides a layer of three layers of clear network, to provide the most suitable network products for a variety of uses.
The information layer /Ethernet (Ethernet) information layer is the highest level of the network system,
Mainly in the PLC, the device controller and production management with PC transmission between production management information, quality management information and the operation of equipment, etc.,
Information layer using the most common Ethernet.
It is not only able to connect the PC system UNIX, windows system, etc.,
And can connect a variety of FA devices.
The Ethernet module has the function of Internet e-mail receiving and sending,
The user can send and receive the production information conveniently in any place of the world,
Build a remote monitoring management system.
At the same time, the use of the Internet FTP server functions and MELSEC protocol can be very easy to achieve the program upload / download and transfer of information.
MR-J3-70B Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=MR-J3-70B&select=5