Motor series: medium inertia, medium capacity.
Using a serial absolute / incremental encoder.
Rated output power: 1.5kw.
Rated speed: 2000rpm.
With a brake band.
Shaft end: straight shaft.
The rotor of AC servo motor is usually made of squirrel cage, but in order to make the servo motor has a wide range of speed regulation, linear mechanical properties,
Without the "rotation" phenomenon and the performance of the fast response, it is compared with the ordinary motor,
The two characteristics of rotor resistance and moment of inertia should be provided
MR-PWS1CBL5M-A2-H
At present, there are two kinds of rotor structure, one is the squirrel cage rotor, which is made of conductive material with high resistivity,
In order to reduce the moment of inertia of the rotor, the rotor is slender.Output points: 32 points.
Voltage: DC24V.
OFF leakage current: 0.1mA.
Output type: bidirectional thyristor output (type sink).
Response time: 2ms.
32 points / a common end.
50 point terminal station.
With the surge absorber.
Each scanning process. Focus on the input signal sampling. Focus on the output signal to refresh.
Input refresh process. When the input port is closed,
Program in the implementation phase, the input end of a new state, the new state can not be read.
Only when the program is scanned, the new state is read.
A scan cycle is divided into the input sample, the program execution, the output refresh.
The contents of the component image register are changed with the change of the execution of the program.
The length of the scan cycle is determined by the three.
CPU the speed of executing instructions.
Time of instruction.
Instruction count.
Due to the adoption of centralized sampling.
Centralized output mode.
There exist input / output hysteresis phenomena, i.e., the input / output response delay.
PLC selection with the development of PLC technology, more and more types of PLC products,
Function is becoming more and more perfect, and its application is more and more extensive.
Different series of different models of PLC has different performance, applicable occasions also have different emphasis,
Price also has a greater difference. Therefore PLC selection,
Under the premise of meeting the control requirements,
Should consider the best performance to price ratio, a reasonable choice of PLC.
System program memory for storing system program,
Including management procedures, monitoring procedures, as well as the user program to do the compiler to compile the process of interpretation.
Read only memory. Manufacturers use, content can not be changed, power does not disappear.
MR-PWS1CBL5M-A2-H Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=MR-PWS1CBL5M-A2-H&select=5