Series Name: F940WGOT.
System screen display language: Chinese (simplified).
Display: 6.7 inch widescreen display.
Display color: 256 color.
Display device: LCD TFF.
Resolution: 480 * 234.
Installation type: panel mounting.
The built-in communication port: RS-422 (1ch) /RS-232C (2ch).
Power supply voltage: DC24V.
GOT-F900 series can be easily applied to a variety of different applications.
3 built-in communication channels
MT-BAL-H110K
3 standard communication ports are provided for the same PC (COM2:RS-232C) or a PLC (COM1:RS-232C and COM0:RS-422) communication.
Flexible layout.
F940WGOT can be installed in a vertical or horizontal direction.
The direction of the screen can be directed by programming software.
Screen area.
Through the split screen configuration, you can reduce the operating time.
The image can be divided into two or three parts to display.
According to the user''s application example, the menu screen or the operation of the button sometimes on the screen will often be used to.
As a result, it is very time-consuming and inefficient to make a similar picture every time. Cable length: 3m.
(for MR-J2S- / CP (1) -S084).
For MR-J2S-11KA (4) MR-J2S-22KA to (4). Transmission line unit for MELSECNET/MINI (-S3) twisted pair data link.
Loop: twisted pair I/F.
Remote station: light I/F (plastic fiber).
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.
MT-BAL-H110K Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=MT-BAL-H110K&select=5