MITSUBISHI
Home >> Products >> MITSUBISHI >> A/QnA series PLC >> CPU >> A2CCPU-DC24V cpu module

A2CCPU-DC24V cpu module

MITSUBISHI A2CCPU-DC24V Manual And Instructions
A2CCPU-DC24V Common InstructionsProgramming Manual
A2CCPU-DC24V User's Manual
A2CCPU-DC24V HardwareUser's Manual
A2CCPU-DC24V Dedicated InstructionsProgramming Manual
A2CCPU-DC24V FundamentalsProgramming Manual

MITSUBISHI A2CCPU-DC24V Product information and technical parameters:
Brand: MITSUBISHI
Name: cpu module
Model: A2CCPU-DC24V

Input points: 16 points.
Input voltage and current: 3/7mA DC12/24V.
Input response time: 10ms.
16 point /1 a public side.
Positive pole sharing.
Output points: 16 points.
Output voltage: DC12/24V.
OFF leakage current: 0.1mA.
Output response time: 2ms.
16 point /1 a public side.
Output type: transistor output (type sink) A2CCPU-DC24V.
With the surge absorber.
50 point terminal station.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor A2CCPU-DC24V
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal A2CCPU-DC24V.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc..
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points A2CCPU-DC24V.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process.
Control solenoid valve required I/O points by the action principle of the solenoid valve can be known,
A single coil solenoid vvalve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 output, band switch,
Several bandds are required for several inputs,
In general, a variety of position switches are required to take up 2 input points A2CCPU-DC24V A2CCPU-DC24V. Extension cable.
Length: 1000mm.


...More relevant models >>>>