Input type: DC input, positive public end / negative public end.
Input points: 16 points.
Enter the response time: 0.2ms the following.
Rated input voltage / current: DC24V/5mA.
External connection: 1 wire.
According to the external connection mode and the external equipment input and output specifications,
Choose from a rich product lineup.
Therefore, the terminal station type remote I/O module can be directly mounted to the machine tool.
Input type: DC input, positive public end / negative public end.
Input points: 4 points.
Input response time: 0.5ms below /1.5ms.
Rated input voltage / current: DC24V/4mA.
External connection: 2 wire.
Spring clip terminal.
Do not need to re tighten, suitable for wire specifications for 0.3~1.5MM square AJ65SBTB1-16D1.
Terminal block is 2 piece structure.
An input module shared by the common terminal of the positive and negative
AJ65SBTB1-16D1
The 8 point of the output module is appended to the source type.
Can be installed along the 6 direction. Output type: transistor output, source.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function.
Rated load voltage / current: DC24V/DC24V/0.1A.
External connection: 3 wire AJ65SBTB1-16D1.
Sensor connector type (E-CON type).
Using industry standard E-CON type.
Simple wiring through sensor connector.
When installing the module can choose to use the DIN guide rail or screw mounting.
3 wire sensor input. Screw, 2 piece type terminal
Platinum temperature measuring resistor body PT100 temperature input module.
Number of channels: 4 channels.
Number of stations: 4 stops AJ65SBTB1-16D1.
Station type: remote equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the eelectrical wiring diagram and wiring diagram AJ65SBTB1-16D1.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program deesign and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced AJ65SBTB1-16D1.