Input type: DC input, positive public end / negative public end.
Input points: 4 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/4mA.
Output form: relay output.
Output points: 4 points.
OFF leakage current: -.
Output protection function: No.
Rated load voltage / current: DC30V/AC250V/2A.
External connection: 2 line /2 line type.
Screw terminal table type.
Minimum size of industry.
The connection object at a glance with terminal cover plate.
Input module for public end of positive pole and negative pole.
Terminal table structure capable of connecting with 2 wire type sensor and load in the same condition.
Can be installed along the 6 direction.
Output type: transistor output, drain type.
Output points: 2 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC24V/0.1A.
External connection: 2 wire.
Cable type.
Minimum size of industry.
Can be like a cable, placed in the online slot.
The communication cable and the external equipment connecting cable is a type, and the wiring is simple CL1XY8-DR1B2
CL1XY8-DR1B2
Communication side, input and output side with cable (50cm). Input type: DC input, positive public end / negative public end.
Input points: 2 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/4mA.
Output form: relay output.
Output points: 2 points.
OFF leakage current: - CL1XY8-DR1B2.
Output protection function: No.
Rated load voltage / current: DC30V/AC250V/2A.
External connection: 2 line /2 line type.
Screw terminal table type.
Minimum size of industry.
The connection object at a glance with terminal cover plate.
Input module for public end of positive pole and negative pole.
Terminal table structure capable of connecting with 2 wire type sensor and load in the same condition CL1XY8-DR1B2.
Can be installed along the 6 direction. Number of channels: RS422, 1 channel
.
Configuration of master / local station,
In addition to the other site network with different CC-Link in addition to the main station and the remote station configuration can also be the main station and the local station configuration.
A local PLC can communicate with the master station PLC and other remote workstations.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of thee electrical wiring diagram and wiring diagram CL1XY8-DR1B2.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program deesign and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced CL1XY8-DR1B2.