RS-232 1 channels.
With DC input 2 points.
Transistor output 2.
Number of stations: 1 stops.
Station type: intelligent equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step
FR-D720-0.2K
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of the electrical wiring diagram and wiring diagram.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program design and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced. Input points: 16 points.
Input voltage and current: 4mA DC24V.
Response time: 0.1/0.2/0.4/0.6/1ms.
16 point /1 a public side.
Common anode.
18 point terminal station.
A variety of modules with excellent performance,
Meet the needs of various control from analog to location.
Q series module products include a variety of types of I/O, analog and positioning function module.
Can fully meet the switch, sensor, such as the input and output, temperature, weight, flow and motor, drive control,
As well as the requirements of high-precision control of the positioning of the industry, the control needs of various fields.
Can also be used in combination with the CPU module to achieve appropriate control.
Continue to go beyond, to climb the peak of Q series.
Strengthen security function.
Can be set up to 32 characters of the file password.
In addition to the English letters, numbers, but also the use of special characters,
To further enhance the security of the password.
In addition, only pre registered devices are allowed to access CPU,
To intercept unauthorized access to unauthorized users.
Therefore, it is important to prevent the outflow of important program assets and protect intellectual property rights.
Easy connection programming tool via ethernet.
Programming tools (Works2 GX, Developer GX) and CPU direct connection (1 to 1),
No need to carry out the IP address settings. And there is no need to select the cable, the straight line and the cross line can be used.
Therefore, this connection method and the use of USB, can easily communicate with the CPU,
Even the operators are not familiar with the network settings can easily establish a connection.