MITSUBISHI
Home >> Price >> MITSUBISHI >> MITSUBISHI MR-J2-03C5 Price
Brand sort

MITSUBISHI MITSUBISHI MR-J2-03C5 Price

Country: JAPAN
Name: Driver
Model: MR-J2-03C5
Price: 0
MITSUBISHI MR-J2-03C5
Output points: 64 points.
Output type: leakage type.
Rated output voltage: DC12 ~ 24V.
Max load current: 0.1A/1 point.
Protection function: have.
Common way: 32 point / public end.
Input / output occupied points: 64 points (I/O distribution: output 64 points).
External wiring connection: 40 pin connector two.
The switch input and output module is a device which can collect the input / output of the switch signal,
Digital I/O modules are often called MR-J2-03C5
The switch signal is collected to the computer or the computer to send the relevant instructions through the RS-485 bus to control the switch of the switch,
Can also be carried out through the RS-485 bus communication,
Remote control switch.
Communication protocol is a standard Modbus protocol or custom protocol. DC input points: 8 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
8 point /1 a public side.
Positive / negative sharing.
Output points: 8 points.
Output voltage and current: DC24V/AC240V, 2A/1 point, 5A/1 common end.
Response time: 12ms.
8 point /1 a public side.
Output form: relay output.
34 point terminal station.
Number of stations: 2 stops.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.
MR-J2-03C5 Operation manual / Instructions / Catalog download link: /searchDownload.html?Search=MR-J2-03C5&select=5


...more relevant model market price >>>>
Related products