Input voltage range: AC100-240V.
Output voltage: DC5V.
Output power: 8.5A.
Simplified program debugging.
Can use the software with the implementation of the conditions of the test function, any step in the program,
Changes the value of the soft component to a user specified value.
In the past, when debugging the specific loop process, the need to add a set of soft components of the program,
At present, through the use of the function, no need to change the program, you can make a specific loop program segment execution action
A1SX42-S1
Therefore, do not need to change the program separately in order to debug, debugging operation is more simple.
Through the expansion of soft components, more convenient to create the program.
M soft components and B soft components can be expanded to 60K points, making the program easier to understand.
Auto backup key data.
Save the program and parameter files automatically to the program memory (ROM Flash) without using the backup battery,
To prevent the loss of the program and the parameters due to forgetting to replace the battery.
In addition, the soft component data and other important data can be backed up to the standard ROM,
In order to avoid during the long holiday and other planned downtime,
The data is lost due to battery depletion.
The next time the power is turned on, the backup data will be automatically restored.Analog channel: 4 channels.
Input / output (resolution): 0 ~ 4000.
Conversion speed: 100ms/4 channel.
Analog module installation.
Power supply: AC170V ~ 264V.
According to the control requirements of the system, using the appropriate design method to design MITSUBISHI PLC program.
Procedures to meet the requirements of system control as the main line,
Write one by one to achieve the control function or the sub task of the program,
Gradually improve the functions specified by the system.
MITSUBISHI PLC detection, fault diagnosis and display and other procedures.
These procedures are relatively independent, generally in the basic completion of the program design and then add.
Hardware simulation method is to use a number of hardware equipment to simulate the generation of the signal,
The signals are connected to the input end of the PLC system in a hard wired way, and the timeliness is strong.
Software simulation method is in the MITSUBISHI PLC in the preparation of a set of simulation program,
The simulation provides the field signal, which is simple and easy to operate, but it is not easy to guarantee the timeliness.
Simulation of the process of debugging, debugging method can be used to segment, and the monitoring function of programmer.