CC-Link (intelligent equipment station).
Twisted pair. MITSUBISHI universal AC servo amplifier MELSERVO-JE series.
Rated output: 3.0kw.
Interface: General purpose.
Compatible motor: HG-KN302J-S100, HG-KN302BJ-S100.
MR-JE-A is equipped with a positioning function!
Be able to realize the positioning of the point set list and the way of the program.
At the same time, it also has a simple cam, encoder to follow, mark detection and other equipment can achieve high performance of the advanced functional group
HA-FF23
Without positioning module, the controller can build a positioning system, which can simplify the system.
Command interface using DI/O and RS-422/RS-485 serial communication (maximum 32 axis),
Can simply set the positioning data through the Configurator2 MR. Multimode fiber optic cable.
Double circuit.
Controller network (control station / common station).
With external power supply function.
Decentralized control of large scale controller,
IE CC-Link controller network module connected with various field network.
Effectively using Ethernet cable and connector on the market, can reduce the cost.
The performance of the cycle data update is improved.
The transmission delay time is shortened, and the synchronous waiting time of the application can be shortened.
On the same network to achieve the 256KB network shared memory (cycle data).
No need to distinguish the network can handle large capacity data.
QJ71GP21S-SX, CC-Link can be used as the control station of IE QJ71GP21-SX controller network, common station.ROM capacity: 32K bytes (max 15K step).
A2A, A2A-S1, A3A, A2N, A2N-S1, A3N storage box. 128MB flash ROM.
Applicable models: GT16, GT15, GT11, HandyGOT. DC input points: 4 points.
Input voltage and current: 7mA, DC24V.
Response time: 10ms.
4 point /1 a public side.
Positive / negative sharing.
16 point terminal station.
MITSUBISHI PLC protection and chain procedures.
Protection and chain is an indispensable part of the program, must be carefully considered.
It can avoid the control logic confusion caused by illegal operations.
MITSUBISHI PLC initialization procedure. After MITSUBISHI PLC on power, the general need to do some of the initial operation,
In order to start making necessary preparations, to avoid the wrong operation of the system.
The main contents of the initialization program are: to some data area, counter and so on,
Data needed to restore some of the data area,
Set or reset some relays,
For some initial state display, etc..
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation.