Input voltage range: AC100-240V.
Output voltage: DC5V.
Output power: 8.5A.
Simplified program debugging.
Can use the software with the implementation of the conditions of the test function, any step in the program,
Changes the value of the soft component to a user specified value.
In the past, when debugging the specific loop process, the need to add a set of soft components of the program,
At present, through the use of the function, no need to change the program, you can make a specific loop program segment execution action
QD75MH4
Therefore, do not need to change the program separately in order to debug, debugging operation is more simple.
Through the expansion of soft components, more convenient to create the program.
M soft components and B soft components can be expanded to 60K points, making the program easier to understand.
Auto backup key data.
Save the program and parameter files automatically to the program memory (ROM Flash) without using the backup battery,
To prevent the loss of the program and the parameters due to forgetting to replace the battery.
In addition, the soft component data and other important data can be backed up to the standard ROM,
In order to avoid during the long holiday and other planned downtime,
The data is lost due to battery depletion.
The next time the power is turned on, the backup data will be automatically restored.Input points: 16 points.
Input voltage and current: 3/7mA DC12/24V.
Input response time: 10ms.
16 point /1 a public side.
Positive and negative sharing.
Output points: 16 points.
Output voltage: DC24V/AC240V, 2A/1 point, 4A/ common end.
Output response time: 12ms.
Output type: relay output.
8 point /1 a public side.
50 point terminal station.
Control solenoid valve required I/O points by the action principle of the solenoid valve can be known,
A single coil solenoid valve with PLC control to 2 input and 1 output,
A double coil solenoid valve requires 3 inputs and 2 outputs,
A button needs an input; a light sensitive switch needs 4 or 2 inputs,
A signal lamp needs 1 output, band switch,
Several bands are required for several inputs,
In general, a variety of position switches are required to take up 2 input points.
MITSUBISHI PLC is the main product in the production of MITSUBISHI motor in Dalian.
It uses a kind of programmable memory for its internal storage procedures,
Execute logic operation, sequence control, timing, counting and arithmetic operations, user oriented instruction,
And through digital or analog input / output control of various types of machinery or production process.
The number of I/O thyristor DC motor control required tube DC motor speed control system is the main form of DC speed regulation,
The thyristor rectifier unit is used to supply power to the DC motor.
PLC control of the DC drive system, the input of the PLC in addition to the main signal outside the signal,
We need to consider the switching signal, the fault signal transmission device, brake signal and fan fault signal.
The output of the PLC mainly consider the speed command signal positive 1~3 level, 1~3 level, allowing reverse switching signal and brake open signal etc..
In general, a reversible DC drive system controlled by PLC is approximately 12 input points and 8 output points,
An irreversible DC drive system requires 9 inputs and 6 output points.
QD75MH4 Operation manual / Instructions / Catalog download link:
/searchDownload.html?Search=QD75MH4&select=5