Cable type: twisted pair.
A1SJ71PT32-S3 and A1SJ71PT32-S3 are the main control module of MELSECNET/MINI-S3,
The main PLC in the network can control 64 remote I/O modules.
The main control module carries on the high speed data communication to the remote module on the connection network.
But up to no more than the maximum allowed by the main I/O CPU points.
A1SJ71PT32-S3 can be used in the cable system can also be used in twisted pair cable system;
A1SJ71T32-S3 can only be used in twisted pair cable network.
The popularization and application of PLC programming has been developed rapidly in our country,
It has been widely used in all kinds of mechanical equipment and production process of electrical control devices,
All walks of life have emerged a large number of application of PLC transformation of the results of the equipment.
Understand the working principle of PLC, have the ability to design, debug and maintain the PLC control system,
Has become the basic requirements of modern industry for electrical technicians and engineering students.
The instruction list programming language is a programming language similar to assembly language mnemonic,
As well as assembly language by the operation code and the number of operations.
In the case of the computer for the PLC handheld programmer compile user program.
At the same time, the programming language of the instruction list corresponds to the ladder diagram programming language,
In PLC programming software can be converted to each other. Figure 3 is the instruction sheet corresponding to the ladder diagram of figure 2PLC.
The characteristics of instruction table programming language is used to represent mnemonic operation function,
In the handheld programmer on the keyboard using the mnemonic representation, easy to operate, can be programmed in computer;
There is a one-to-one correspondence between the ladder diagram and the ladder diagram. Its characteristics are basically consistent with the ladder diagram language.
5 slots; requires 1 AnS series PLC power modules;
Used to install large AnS series PLC module.
Base plate of AnS series PLC.
QA1S series PLC 5 slot main substrate.
AnS series of modules can be installed. Cable length: 3 meters
Extending cable to connect CPU main substrate and extended substrate,
According to the model can provide different cable length,
If you need to connect the AnN type expansion substrate is required,
Selection of A1SC05NB (A1SC07NB) cable A1SJ71T32-S3
A1SJ71T32-S3 I/O control method: refresh mode or direct mode.
User program storage capacity: 14K step.
I/O points: 512 points.
Memory capacity: bytes 64K.
ANSCPU has been updated to ANSHCPU, and it has the following advantages.
16 bit dedicated microprocessor A1SJ71T32-S3.
Large capacity battery backup memory RAM.
Extended I/O control capability.
Dedicated CC-Link instruction.
Capacity for extended comment storage.
PLC programming is a digital computing operation of the electronic system,
Designed for applications in industrial environments.
It uses programmable memory,
An instruction used to perform logical operations, sequence control, timing, counting and arithmetic operations in its internal storage,
And through the digital, analog input and output, control of various types of machinery or production process A1SJ71T32-S3.
Programmable controller and related equipment,
Should be easy to make the industrial control system to form a whole, easy to expand the principle design of its functions. 3C-2V/5C-2V coaxial cable between the single bus PC network (control station / common station) / remote I/O network (remote master).
The response time of PLC is the interval between the time of the change of the external output signal of the PLC and the time of the change of the external output signal which is controlled by it,
Lag time, this is the time constant of the input circuit,
The time constant of the output circuit, the arrangement of the user statement and the use of the instruction,
The cycle scan mode of PLC and the way of PLC to refresh the I/O and so on.
This phenomenon is called the I/O delay time effect.
Switch volume control is designed to,
According to the current input combbination of the switch quantity and the history of the input sequence,
So that PLC generates the corresponding switching output,
In order to make the system work in a certain order A1SJ71T32-S3.
So, sometimes also known as the order control.
And seqquential control is divided into manual, semi-automatic or automatic A1SJ71T32-S3.
And the control principle is decentralized, centralized and hybrid control three.