Input type: DC input, positive common end.
Input points: 4 points.
Input response time: 0.5ms below /1.5ms.
Rated input voltage / current: DC24V/4mA.
External connection: 3 wire.
Sensor connection type.
Minimum size of industry.
When installing the module can choose to use the DIN guide rail or screw mounting.
3 wire sensor input.
Input type: DC input, positive common end.
Input points: 16 points.
Enter the response time: 1.5ms the following.
Rated input voltage / current: DC24V/5mA.
Output form: transistor output, leakage type.
Output points: 16 points.
OFF leakage current: 0.1mA.
Output protection function: No.
Rated load voltage / current: DC24V/0 CL1X4-D1C3. 1A.
External connection: 1 line /1 line type.
Fast connector type
CL1X4-D1C3
Simple wiring through quick connector.
Can be installed along the 6 direction.
MITSUBISHI PLC program simulation debugging
The basic idea of program simulation debugging is,
In order to facilitate the form of simulation to generate the actual state of the scene,
Create the necessary environmental conditions for the operation of the program CL1X4-D1C3.
Depending on the way the field signals are generated,
The simulation debugging has two forms of hardware simulation and software simulation. Input type: DC input, positive public end / negative public end.
Input points: 8 points.
Input response time: 0.5ms below /1.5ms.
Rated input voltage / current: DC24V/4mA.
External connection: 2 wire.
Spring clip terminal CL1X4-D1C3.
Do not need to re tighten, suitable for wire specifications for 0.3~1.5MM square.
Terminal block is 2 piece structure.
An input module shared by the common terminal of the positive and negative.
The 8 point of the output module is appended to the source type.
Can be installed along the 6 direction. Screw, 2 piece type terminal
Temperature measuring resistor body input module.
Number of channels: 4 channels.
Number of stations: 1 stops.
Station type: remote equipment station.
MITSUBISHI PLC online debugging.
On-line debugging is the process that will through the simulation debugging to further carry on the on-line unification to adjust.
On-line debugging process should be step by step,
From MITSUBISHI PLC only connected to the input device, and then connect the output device, and then connect to the actual load and so on and so on step by step.
If you do not meet the requirements, the hardware and procedures for adjustment.
Usually only need to modify the part of the program can be.
MITSUBISHI PLC hardware implementation
Hardware implementation is mainly for the control cabinet and other hardware design and field construction.
Design control cabinet and the operating table and other parts of tthe electrical wiring diagram and wiring diagram CL1X4-D1C3.
Electrical interconnection diagram of each part of the design system.
According to the construction drawings of the site wiring, and carry out a detailed inspection.
Because the program deesign and hardware implementation can be carried out at the same time,
So the design cycle of the MITSUBISHI PLC control system can be greatly reduced CL1X4-D1C3.